The impact of overtime duration variations on labor productivity in apartment construction projects: A study on engineering and disaster management in the construction sector
DOI:
https://doi.org/10.61511/calamity.v2i2.2025.1321Keywords:
apartment building, construction projects, cost efficiency, labour utilization rate, labor productivity, overtimeAbstract
Background: Construction projects, especially apartment buildings, often face challenges such as resource limitations, unpredictable weather, and schedule delays, which lead to increased costs and reduced productivity. Overtime is a commonly adopted strategy to address these issues; however, its effect on labor productivity is complex. Methods: This study investigates the impact of varying overtime durations (1, 2, and 3 hours) on labor productivity and Labour Utilization Rate (LUR) for three critical tasks: rebar installation, concrete casting, and formwork installation in the Sky House Alam Sutera project. The Productivity Rating method and LUR analysis were used to evaluate normal productivity and productivity during overtime, with data collected through direct observation, interviews, and project documentation analysis. Findings: The results reveal that while overtime increases daily output, it also reduces productivity per hour as work hours extend. Rebar installation exhibited the most significant decline in productivity, from 493.529 kg/hour during regular hours to 345.470 kg/hour with 3 hours of overtime. Correspondingly, the LUR improved with overtime, with rebar installation increasing from 68% under normal conditions to 72% with 3 hours of overtime. Similarly, the cost of labor increased by 9%–23% due to overtime, depending on the task and duration. Conclusion: The findings suggest that the optimal overtime duration is 1 hour, balancing productivity gains, cost efficiency, and LUR improvements, while prolonged overtime may lead to diminishing returns due to worker fatigue. This study provides insights into managing overtime in construction projects, emphasizing the importance of controlling overtime durations to achieve project objectives efficiently. Novelty/Originality of this article: This study offers an original perspective by examining the impact of varying overtime durations on both labor productivity and Labor Utilization Rate (LUR) in the context of construction projects, using a detailed analysis of three critical tasks.
References
Alaloul, W. S., Musarat, M. A., Mehmood, H., & Altaf, M. (2021). Assessment of Labour Productivity in Road Construction Projects of Pakistan. Journal of Civil Engineering Science and Technology, 12(1), 32–38. https://doi.org/10.33736/jcest.3340.2021
Bista, B., Neupane, U., & Bhattarai, S. K. (2024). Identifying the Causes of Dissatisfaction of Construction Labour: A Case Study of Building Construction of Jajarkot District Hospital, Nepal. Himalayan Journal of Applied Science and Engineering, 4(2), 63–78. https://doi.org/10.3126/hijase.v4i2.62188
Citra, Z., Malinda, Y., Apdeni, R., Dwiyanto Wibowo, P., Wibisono, A., Tsarwan, O. T., Putri Elza, S., Riqzi Fitriansyah, E., Mirnayani, & Dian Suwandari, Y. (2025). Project Performance Analyzed Using Java Application In Steel Tower Building. ARPN Journal of Engineering and Applied Sciences, 19(24), 1463–1471. https://doi.org/https://doi.org/10.59018/122480
Darmawan, D. (2023). Dampak Stres, Supervisi Dan K3 Terhadap Produktivitas Pekerja Proyek Konstruksi. Journal of Civil Engineering Building and Transportation, 7(1), 138–145. https://doi.org/10.31289/jcebt.v7i1.8967
Evanoff, B., Rohlman, D. S., Strickland, J. R., & Dale, A. M. (2019). Influence of Work Organization and Work Environment on Missed Work, Productivity, and Use of Pain Medications Among Construction Apprentices. American Journal of Industrial Medicine, 63(3), 269–276. https://doi.org/10.1002/ajim.23078
Fardila, D., & Adawyah, N. R. (2021b). Optimasi Biaya Dan Waktu Proyek Konstruksi Dengan Lembur Dan Penambahan Tenaga Kerja. Inersia Lnformasi Dan Ekspose Hasil Riset Teknik Sipil Dan Arsitektur, 17(1), 35–46. https://doi.org/10.21831/inersia.v17i1.39499
Ghodrati, N., Yiu, T. W., Wilkinson, S., Poshdar, M., Talebi, S., Elghaish, F., & Sepasgozar, S. M. E. (2022). Unintended Consequences of Productivity Improvement Strategies on Safety Behaviour of Construction Labourers; A Step Toward the Integration of Safety and Productivity. Buildings, 12(3), 317. https://doi.org/10.3390/buildings12030317
Hernandi, Y., & Tamtana, J. S. (2020). Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstruksi Gedung Bertingkat. JMTS Jurnal Mitra Teknik Sipil, 3(2), 299. https://doi.org/10.24912/jmts.v3i2.6985
Jacobsen, E. L., Teizer, J., Wandahl, S., & Brilakis, I. (2024). Probabilistic Forecasting Of Construction Labor Productivity Metrics. Journal of Information Technology in Construction, 24, 58–83. https://doi.org/10.36680/j.itcon.2024.004
Lenggogeni. (2016). Dampak Lembur Terhadap Produktifitas Tenaga Kerja Konstruksi (Sebuah Studi Literatur). Menara Jurnal Teknik Sipil, 1(2), 12. https://doi.org/10.21009/jmenara.v1i2.7824
Luther, L., Gearhart, T., Fukui, S., Morse, G. A., Rollins, A. L., & Salyers, M. P. (2017). Working Overtime in Community Mental Health: Associations With Clinician Burnout and Perceived Quality of Care. Psychiatric Rehabilitation Journal, 40(2), 252–259. https://doi.org/10.1037/prj0000234
Mahamid, I. (2022). Relationship Between Delay and Productivity in Construction Projects. International Journal of Advanced and Applied Sciences, 9(2), 160–166. https://doi.org/10.21833/ijaas.2022.02.018
Mardikaningsih, R., Sinambela, E. A., Retnowati, E., Darmawan, D., Putra, A. R., Arifin, S., Radjawane, L. E., Issalillah, F., & Khayru, N. R. K. (2022). Dampak Stres, Lingkungan Kerja Dan Masa Kerja Terhadap Produktivitas Pekerja Konstruksi. Jurnal Penelitian Rumpun Ilmu Teknik, 1(4), 38–52. https://doi.org/10.55606/juprit.v1i4.616
Matre, D., Skogstad, M., Sterud, T., Nordby, K.-C., Knardahl, S., Christensen, J. O., & Lie, J.-A. (2021). Safety Incidents Associated With Extended Working Hours. A Systematic Review and Meta-Analysis. Scandinavian Journal of Work Environment & Health, 47(6), 415–424. https://doi.org/10.5271/sjweh.3958
Mirnayani, & Kholida, L. (2022). Analysis Of The Motivation Level Of Construction Project Workers During The Covid-19 Pandemic Based On Maslow’s Theory Using The Bayesian Belief Network Method. Jurnal Infrastruktur, 8(2). https://doi.org/10.35814/infrastruktur.v8i2.3752
Mirnayani, M., & Prakoso, S. H. (2024). Analisis Produktivitas Tenaga Kerja Proyek Konstruksi Pekerjaan Shear Wall Dengan Metode Work Sampling. Go Infotech Jurnal Ilmiah Stmik Aub, 30(1), 96–104. https://doi.org/10.36309/goi.v30i1.264
Ngunadi, K., & Anondho, B. (2018). Analisis Pengaruh Faktor Eksternal Terukur Terhadap Durasi Proyek Konstruksi Dengan Metode PLS-Sem. JMTS Jurnal Mitra Teknik Sipil, 1(2), 197. https://doi.org/10.24912/jmts.v1i2.2680
Niu, L., & Yang, Z. (2022). Impact of Performance Climate on Overtime Behaviors of New Generation Employees: The Moderating Effect of Perceived Employability and Mediating Role of Job Insecurity. Psychology Research and Behavior Management, Volume 15, 3733–3749. https://doi.org/10.2147/prbm.s390051
Nurhendi, R. N., & Bastam, M. N. (2023). Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Konstruksi: Tinjauan Literatur. Jurnal Teknik Sipil, 13(1), 53–65. https://doi.org/10.36546/tekniksipil.v13i1.965
Nurhendi, R. N., Khoiry, M. A., & Hamzah, N. (2022). Conceptual Framework Factors Affecting Construction Labour Productivity. Jurnal Kejuruteraan, 34(1), 89–99. https://doi.org/10.17576/jkukm-2022-34(1)-08
Odesola, I. A., Otali, M., & Ikediashi, D. I. (2013). Effects of Project-Related Factors on Construction Labour Productivity in Bayelsa State of Nigeria. Ethiopian Journal of Environmental Studies and Management, 6(6), 817. https://doi.org/10.4314/ejesm.v6i6.12s
Purba, V. G. (2022). Analisis Kinerja Manajemen Konstruksi Pada Proyek Gedung Digitasi Universitas Negeri Lampung. Ilmuteknik.Org, 2(2), 1–11. http://ilmuteknik.org/index.php/ilmuteknik/article/view/77
Rana, B., Sharma, S. B., Neupane, U., & Shrestha, S. K. (2023). Analysis of Labor Productivity in Bricklaying Operation of Building Construction in Surkhet, Nepal. Advances in Engineering and Technology an International Journal, 3(1), 103–119. https://doi.org/10.3126/aet.v3i1.60628
Shen, T. T., & Sammani, D. (2022). The Affect of Localized Project Managers Factors Which Contribute to Enhance in Minimizing Project Delay of Property Developers in Selangor, Malaysia. International Journal of Academic Research in Business and Social Sciences, 12(1). https://doi.org/10.6007/ijarbss/v12-i1/12359
Stimpfel, A. W., Sloane, D. M., & Aiken, L. H. (2012). The Longer the Shifts for Hospital Nurses, the Higher the Levels of Burnout and Patient Dissatisfaction. Health Affairs, 31(11), 2501–2509. https://doi.org/10.1377/hlthaff.2011.1377
Subakir, A. H., & Sugiyanto, S. (2022). Analisis Duration Cost Trade Off Untuk Mengejar Keterlambatan Pelaksanaan Proyek (Studi Kasus: Peningkatan Jalan Simorejo-Baureno Kabupaten Bojonegoro Jawa Timur). Rang Teknik Journal, 5(1), 8–23. https://doi.org/10.31869/rtj.v5i1.2705
Sujana, C. M., & Hakim, R. A. (2021). Perbandingan Produktivitas Tenaga Kerja Pembesian Dan Bekisting Saat Jam Kerja Normal Dan Lembur Menggunakan Metode Productivity Rating. Jurnal Rekayasa Konstruksi Mekanika Sipil (Jrkms), 145–152. https://doi.org/10.54367/jrkms.v4i2.1400
Tanemura, T., Zaitsu, T., Oshiro, A., Inoue, Y., Kawaguchi, Y., & Aida, J. (2023). Association of Overtime Work Duration With Oral Health-Related Quality of Life in Japanese Workers. Journal of Oral Science, 65(1), 44–47. https://doi.org/10.2334/josnusd.22-0267
Vigneshwar, R. V. K., & Shanmugapriya, S. (2022). Investigating the Factors Affecting Construction Site Productivity – A case of India. Engineering Construction & Architectural Management, 30(2), 963–985. https://doi.org/10.1108/ecam-06-2022-0529
Wijaya, V., & Waty, M. (2023). Pengaruh Lingkungan Kerja, Pelaksanaan K3, Dan Tenaga Kerja Terhadap Produktivitas Tenaga Kerja. JMTS Jurnal Mitra Teknik Sipil, 355–366. https://doi.org/10.24912/jmts.v6i2.21975
Yanti, G. (2017). Produktivitas Tenaga Kerja Dengan Metode Work Sampling Proyek Perumahan Di Kota Pekanbaru. Siklus Jurnal Teknik Sipil, 3(2), 100–106. https://doi.org/10.31849/siklus.v3i2.385
Zhang, M., Murphy, L. A., Fang, D., & Cabán-Martinez, A. J. (2015). Influence of Fatigue on Construction Workers’ Physical and Cognitive Function. Occupational Medicine, 65(3), 245–250. https://doi.org/10.1093/occmed/kqu215
Downloads
Published
How to Cite
Issue
Section
Citation Check
License
Copyright (c) 2025 Mirnayani, Hafisa Paradiba

This work is licensed under a Creative Commons Attribution 4.0 International License.